INSTITUTE OF ENGINEERING
- First Year Engineering
- Vision & Mission
- Academic Calendar
- Faculty
- Staff Achievements
- Staff Involvement & Participation
- News & Events
- BRAINIACS (FE Student Forum)
- Current Time-Table
- Lab Information (2024 Pattern)
- Lab Information (2019 Pattern)
- Lab Information (2015 Pattern)
- Course Outcomes
- Toppers
- Syllabus
- Student Roll List
DEPARTMENT OF ENGINEERING SCIENCES
Laboratory
Sr.No. | Name of the Laboratory | No.of Students per setup (Batch Size) | Name of the Important Equipment | Weekly utilization status (all the courses for which the lab is utilized) | Technical Manpower Support | ||
Name of the Technical Staff | Designation | Qualification | |||||
1 | Engineering Physics Laboratory | 20 | 1. Laser Experiment Set up. 2. Uiltrasonic inter ferrometer 3. Magnetic Suscptibility 4. Halleffect 4 probe. |
18 Hours | Mr. Arun G. Patil | Technical Assistant | B.Sc. Physics |
2 | Engineering Chemistry Laboratory | 20 | 1. Digital Balance 2.MuffleFurnance 3. Hot Air Oven 4. pH meter 5. Coloriemeter |
18 Hours | Mr Sunil P. Sonavani | Technical Assistant | B.Sc. Chemistry, SET (M.Lib) |
3 | Basic Electronics Engineering Lab | 20 | 1.CRO 2. Fun. Generator 3. Power Supply 4. Trainer Kit 5. Multimeter |
18 Hours | Mr V.A. Tile | Technical Assistant | Diploma |
4 | Engineering Mechanics Lab | 20 | 1. Reaction Beam Apparatus 2. Force Table Apparatus 3. Belt Friction Apparatus |
18 Hours | Mr. P. S. Patil | Technical Assistant | M.E (Environmental) Pursuing |
5 | Basic Electrical Engineering Lab | 20 | 1. Electrical Accessories Kit 2. 1ø ,3Ø Transformer 3. Load Bank 4. RTC Kit (KVL, KCL , Super Position, Thevenis Kit) 5. Multimeter |
18 Hours | Mr. S. B. Amrutkar | Technical Assistant | B.Tech Electronics M.Tech Pursuing |
6 | Basic Mechanical Engineering Lab | 20 | Models | 18 Hours | Mr. Mandar Sali | Technical Assistant | BE |
7 | Engineering Graphics Lab | 20 | Drawing Models | 18 Hours | Mr. Sharad Nirgude | Technical Assistant | ME |
8 | Fundamental Programming Language Lab | 20 | 3rd generation think center computer system UBUNTO operating system | 36 Hours | Mr. Suyog Gorhe | Network Assistant | B.Com. + Hardware and Networking Course |
9 | Manufacturing Processes Lab | 20 | 1. Drill Machine 2. Arc Welding M/ C 3. Tools |
18 Hours | Mr. Manik Nathe | Technical Assistant | ME |
10 | Basic Civil and Environmental Engineering Lab | 20 | 1. Total Station 2. Dumpy Level 3. Leser Level 4. GPS |
18 Hours | Mr. P.S.Patil | Technical Assistant | M.E (Environmental) Persuing |